decks ...

Site measurements by clients :
Name :
Contact No.:
E-mail Address:
Measurements:
Vertical heights
Horizontal lengths:
Floor plan area:
No. of stories:
Column and Beam Requirements, if any:
Any further queries:

Notes:

  • A leveling screed may be required to compensate for adjustments made to accommodate floor to floor levels.
  • All measurements must be checked on site prior to installation.
  • A 50mm topping will be required on all Eco Landing Slabs.
  • The rake of the stringers are to be adjusted on site to the correct on site floor to floor levels.
  • All stringers must be grouted after installation.
  • Do not scale, use figured dimensions only.
  • Large scale details to be used where available.
  • This drawing is to be read in conjunction with any relevant architectural, structural or other drawings.
  • Any errors or discrepancies are to be reported immediately for correction before installation commences.
  • Design imposed loads ...4.0.......kn/m.