Eco Voided Concrete Slab - TM

Manufactured in accordance with specifications from Europe and purpose made designs by eco engineers.
Eco Voided Concrete Slab's still require scaffolding support, speeds up the construction process and takes the complications out of floor design.


Simple to use...
Eco Decking Plates form the base of the cast floor slab and eliminate the need for casting formwork. They are stiff enough to be handled into place and require only minimal temporary supports to ensure an evenly flat and level underside. Once the decking plates have been placed the in-situ concrete slab may be cast.


Purpose Made...
Specific plates can be designed for high load floor areas or to have specially shaped toe-sections e.g. for a balcony. Additional or heavier lattices can be provided to cope with differing floor loads. Void formers for fittings can be cast in.


Small or large...
The system is suitable for simple double storey houses or complex
multi-storey buildings.

Placing the decking plates...
The crane has a reach up to 28 meters and can place
50m - 100m of decking per hour. No shuttering is needed, simple temporary support props with timber bearers at 1.8cm centres are required, and labour to assemble the plates.

Our quote will include...
  • A full design service
  • Provision of certified drawings, including- details of the floor area, weight per square metre, required thickness of the floor slab, the quality of concrete for the in-situ cast, any additional work and preparation to be done, and the cost of delivery and placing, excluding labour.